John Reilly, Alton, Hampshire

Client: John Reilly

Ecocrib System: Soil Nailing with EcoCrib face

Face Area: 295 m2

Maximum Retained Height: 5.2m

Plastic Waste Diverted from Landfill: 34 tonnes

Designer: Geoman Ltd

The first lot of photos are after we installed EcoCrib, the second lot of photos are of the timber crib we replaced.