Alfred McAlpine, Evesham
PC Construction supplied plant, labour and materials to construct this gabion wall. The cages were used to stablise a rail embankment which was at risk of slipping onto the track. All excavation and construction was carried out in 4 metre lengths.
- Face Area: 240m³
- Height: 3m
- Construction time: 2 weeks