St Asaph, N. Wales, Gabions

PC Construction's contract work includes the excavation and placement of foundation, supply and construction of gabion walls and placement of the backfill. 

The gabion cages were placed to stop the erosion to a river bank in St Asaph, north wales. The works had to be carried out due to a gas main that crossed the field that was being eroded by the river. All materials and plant were transported half a mile across two fields.

  • Face Area: 580m³
  • Height: 3.3m
  • Construction time: 2 weeks