Marshalls, Glasshoughton

PC Construction's contract works included the supply, design and construct of this gabion wall which was installed as a feature. Different coloured bricks were placed in the front face with random panel fencing to the rear of the wall. This was to disguise a bin storage area on an outlet village.

  • Face Area: 240m³
  • Height 2m 
  • Construction time: 6 days