Luton To Dunstable Busway
LOCATION: Luton Busway, Luton, Bedfordshire
CLIENT: BAM Nuttall Ltd
ECOCRIB SYSTEM: Mass Gravity
FACE AREA: 240m²
MAXIMUM RETAINED HEIGHT: 3.8M
PLASTIC WASTE DIVERTED FROM LANDFIL: 20 Tonnes
CONSTRUCTION TIME: 7 days
Ecocrib walling was used to retain an embankment on the new guided bus way between Luton and Dunstable. The busway were happy to use a system that not only did the job efficiently but also cost effective for them.