Luton To Dunstable Busway

LOCATION: Luton Busway, Luton, Bedfordshire

CLIENT: BAM Nuttall Ltd

ECOCRIB SYSTEM: Mass Gravity

FACE AREA: 240m²

MAXIMUM RETAINED HEIGHT: 3.8M

PLASTIC WASTE DIVERTED FROM LANDFIL: 20 Tonnes

CONSTRUCTION TIME: 7 days

 

Ecocrib walling was used to retain an embankment on the new guided bus way between Luton and Dunstable. The busway were happy to use a system that not only did the job efficiently but also cost effective for them.

« Back to Case Studies