Winvic Construction, Hinkley
PC Construction's contract works included the supply and construction of this gabion wall and the placement of backfill. The gabion cages were constructed alongside a pre existing road to gain level ground on site.
- Total face area: 975m³
- Total backfill: 1311m³
- Max Height: 4m