Barratt Homes, Peterborough

PC Construction's contract works included the excavation, supply and placement of blocks and fill. Modular block reinforced soil walling was used to construct a watercourse between two lakes. The channel allowed water to travel from one lake to another where it was pumped away from the recently constructed housing estate. The site was greenfield when work took place.

  • Face Area: 940m²
  • Total Backfill: 4000m³
  • Total Height: 5m