Jackson Civils, Nottinghamshir
PC Construction's contract work included excavation, construction of gabion wall and placement of backfill. The gabion cages were constructed so the levels to the site could be lifted to enable a new building to be built on a level surface.
- Face Area: 144m³
- Height: 2.5m
- Construction time: 3 days